| Details |
DPR_MSP_TASKS_INT-EARNED_VALUE_METHOD - The method for calculating earned value. ▼
Description: The method for calculating earned value.
Field Name: EARNED_VALUE_METHOD
Data Element:
Data Type: INT4
Length (Dec): 000010 (000000)
Check Table:
Conversion Routine:
Domain Name:
Memory ID:
App Class:
SHLP Name:
SHLP Field:
| Table Name | DPR_MSP_TASKS_INT | | Field Name | EARNED_VALUE_METHOD | | Activation State of Repository Object | A | | Version of the entry (not used) | 0000 | | Position of the field in the table | 0086 | | Identifies a key field of a table | | | Flag: Field is required (not blank) | | | Data element (semantic domain) | | | Check table name of the foreign key | | | Nesting depth for includes | 0 | | ABAP data type (C,D,N,...) | X | | Internal Length in Bytes | 000004 | | Reference Table for Field | | | Name of included table | | | Reference Field for Currency and Quantity Fields | | | Check or generating module for fields | | | Indicator for initial values in database fields | | | Data Type in ABAP Dictionary | INT4 | | Length (No. of Characters) | 000010 | | Number of Decimal Places | 000000 | | Domain name | | | Origin of an Input Help | | | DD: Flag if it is a table | | | DD: Depth for structured types | 01 | | DD: Component Type | | | Type of Object Referenced | | | DD: Indicator for a Language Field | | | Position of the field in the table | 0000 | | Anonymization Indicator (for User Fields) | | | DD: Output Style (Output Style) for Decfloat Types | 00 | | Spatial Reference System | 0 | | Short Description of Repository Objects | | See details of SAP DPR_MSP_TASKS_INT table |
CGPL_MSP_TASKS_INT-EARNED_VALUE_METHOD - ▼
Description:
Field Name: EARNED_VALUE_METHOD
Data Element:
Data Type: INT4
Length (Dec): 000010 (000000)
Check Table:
Conversion Routine:
Domain Name:
Memory ID:
App Class:
SHLP Name:
SHLP Field:
| Table Name | CGPL_MSP_TASKS_INT | | Field Name | EARNED_VALUE_METHOD | | Activation State of Repository Object | A | | Version of the entry (not used) | 0000 | | Position of the field in the table | 0086 | | Identifies a key field of a table | | | Flag: Field is required (not blank) | | | Data element (semantic domain) | | | Check table name of the foreign key | | | Nesting depth for includes | 0 | | ABAP data type (C,D,N,...) | X | | Internal Length in Bytes | 000004 | | Reference Table for Field | | | Name of included table | | | Reference Field for Currency and Quantity Fields | | | Check or generating module for fields | | | Indicator for initial values in database fields | | | Data Type in ABAP Dictionary | INT4 | | Length (No. of Characters) | 000010 | | Number of Decimal Places | 000000 | | Domain name | | | Origin of an Input Help | | | DD: Flag if it is a table | | | DD: Depth for structured types | 01 | | DD: Component Type | | | Type of Object Referenced | | | DD: Indicator for a Language Field | | | Position of the field in the table | 0000 | | Anonymization Indicator (for User Fields) | | | DD: Output Style (Output Style) for Decfloat Types | 00 | | Spatial Reference System | 0 | | Short Description of Repository Objects | | See details of SAP CGPL_MSP_TASKS_INT table |
DPR_MSP_PROJECT_INT-EARNED_VALUE_METHOD - The default method for calculating earned value. ▼
Description: The default method for calculating earned value.
Field Name: EARNED_VALUE_METHOD
Data Element:
Data Type: INT4
Length (Dec): 000010 (000000)
Check Table:
Conversion Routine:
Domain Name:
Memory ID:
App Class:
SHLP Name:
SHLP Field:
| Table Name | DPR_MSP_PROJECT_INT | | Field Name | EARNED_VALUE_METHOD | | Activation State of Repository Object | A | | Version of the entry (not used) | 0000 | | Position of the field in the table | 0035 | | Identifies a key field of a table | | | Flag: Field is required (not blank) | | | Data element (semantic domain) | | | Check table name of the foreign key | | | Nesting depth for includes | 0 | | ABAP data type (C,D,N,...) | X | | Internal Length in Bytes | 000004 | | Reference Table for Field | | | Name of included table | | | Reference Field for Currency and Quantity Fields | | | Check or generating module for fields | | | Indicator for initial values in database fields | | | Data Type in ABAP Dictionary | INT4 | | Length (No. of Characters) | 000010 | | Number of Decimal Places | 000000 | | Domain name | | | Origin of an Input Help | | | DD: Flag if it is a table | | | DD: Depth for structured types | 01 | | DD: Component Type | | | Type of Object Referenced | | | DD: Indicator for a Language Field | | | Position of the field in the table | 0000 | | Anonymization Indicator (for User Fields) | | | DD: Output Style (Output Style) for Decfloat Types | 00 | | Spatial Reference System | 0 | | Short Description of Repository Objects | | See details of SAP DPR_MSP_PROJECT_INT table |
CGPL_MSP_PROJECT_INT-EARNED_VALUE_METHOD - ▼
Description:
Field Name: EARNED_VALUE_METHOD
Data Element:
Data Type: INT4
Length (Dec): 000010 (000000)
Check Table:
Conversion Routine:
Domain Name:
Memory ID:
App Class:
SHLP Name:
SHLP Field:
| Table Name | CGPL_MSP_PROJECT_INT | | Field Name | EARNED_VALUE_METHOD | | Activation State of Repository Object | A | | Version of the entry (not used) | 0000 | | Position of the field in the table | 0035 | | Identifies a key field of a table | | | Flag: Field is required (not blank) | | | Data element (semantic domain) | | | Check table name of the foreign key | | | Nesting depth for includes | 0 | | ABAP data type (C,D,N,...) | X | | Internal Length in Bytes | 000004 | | Reference Table for Field | | | Name of included table | | | Reference Field for Currency and Quantity Fields | | | Check or generating module for fields | | | Indicator for initial values in database fields | | | Data Type in ABAP Dictionary | INT4 | | Length (No. of Characters) | 000010 | | Number of Decimal Places | 000000 | | Domain name | | | Origin of an Input Help | | | DD: Flag if it is a table | | | DD: Depth for structured types | 01 | | DD: Component Type | | | Type of Object Referenced | | | DD: Indicator for a Language Field | | | Position of the field in the table | 0000 | | Anonymization Indicator (for User Fields) | | | DD: Output Style (Output Style) for Decfloat Types | 00 | | Spatial Reference System | 0 | | Short Description of Repository Objects | | See details of SAP CGPL_MSP_PROJECT_INT table |
DPR_MSPREQUEST_RESPONSE-EARNED_VALUE_METHOD - The default method for calculating earned value. ▼
Description: The default method for calculating earned value.
Field Name: EARNED_VALUE_METHOD
Data Element:
Data Type: INT4
Length (Dec): 000010 (000000)
Check Table:
Conversion Routine:
Domain Name:
Memory ID:
App Class:
SHLP Name:
SHLP Field:
| Table Name | DPR_MSPREQUEST_RESPONSE | | Field Name | EARNED_VALUE_METHOD | | Activation State of Repository Object | A | | Version of the entry (not used) | 0000 | | Position of the field in the table | 0037 | | Identifies a key field of a table | | | Flag: Field is required (not blank) | | | Data element (semantic domain) | | | Check table name of the foreign key | | | Nesting depth for includes | 0 | | ABAP data type (C,D,N,...) | X | | Internal Length in Bytes | 000004 | | Reference Table for Field | | | Name of included table | | | Reference Field for Currency and Quantity Fields | | | Check or generating module for fields | | | Indicator for initial values in database fields | | | Data Type in ABAP Dictionary | INT4 | | Length (No. of Characters) | 000010 | | Number of Decimal Places | 000000 | | Domain name | | | Origin of an Input Help | | | DD: Flag if it is a table | | | DD: Depth for structured types | 01 | | DD: Component Type | | | Type of Object Referenced | | | DD: Indicator for a Language Field | | | Position of the field in the table | 0000 | | Anonymization Indicator (for User Fields) | | | DD: Output Style (Output Style) for Decfloat Types | 00 | | Spatial Reference System | 0 | | Short Description of Repository Objects | | See details of SAP DPR_MSPREQUEST_RESPONSE table |
DPR_MSP_TASK_HEADER_INT-EARNED_VALUE_METHOD - The method for calculating earned value. ▼
Description: The method for calculating earned value.
Field Name: EARNED_VALUE_METHOD
Data Element:
Data Type: INT4
Length (Dec): 000010 (000000)
Check Table:
Conversion Routine:
Domain Name:
Memory ID:
App Class:
SHLP Name:
SHLP Field:
| Table Name | DPR_MSP_TASK_HEADER_INT | | Field Name | EARNED_VALUE_METHOD | | Activation State of Repository Object | A | | Version of the entry (not used) | 0000 | | Position of the field in the table | 0085 | | Identifies a key field of a table | | | Flag: Field is required (not blank) | | | Data element (semantic domain) | | | Check table name of the foreign key | | | Nesting depth for includes | 0 | | ABAP data type (C,D,N,...) | X | | Internal Length in Bytes | 000004 | | Reference Table for Field | | | Name of included table | | | Reference Field for Currency and Quantity Fields | | | Check or generating module for fields | | | Indicator for initial values in database fields | | | Data Type in ABAP Dictionary | INT4 | | Length (No. of Characters) | 000010 | | Number of Decimal Places | 000000 | | Domain name | | | Origin of an Input Help | | | DD: Flag if it is a table | | | DD: Depth for structured types | 00 | | DD: Component Type | | | Type of Object Referenced | | | DD: Indicator for a Language Field | | | Position of the field in the table | 0000 | | Anonymization Indicator (for User Fields) | | | DD: Output Style (Output Style) for Decfloat Types | 00 | | Spatial Reference System | 0 | | Short Description of Repository Objects | | See details of SAP DPR_MSP_TASK_HEADER_INT table |
CGPL_MSPREQUEST_RESPONSE-EARNED_VALUE_METHOD - ▼
Description:
Field Name: EARNED_VALUE_METHOD
Data Element:
Data Type: INT4
Length (Dec): 000010 (000000)
Check Table:
Conversion Routine:
Domain Name:
Memory ID:
App Class:
SHLP Name:
SHLP Field:
| Table Name | CGPL_MSPREQUEST_RESPONSE | | Field Name | EARNED_VALUE_METHOD | | Activation State of Repository Object | A | | Version of the entry (not used) | 0000 | | Position of the field in the table | 0037 | | Identifies a key field of a table | | | Flag: Field is required (not blank) | | | Data element (semantic domain) | | | Check table name of the foreign key | | | Nesting depth for includes | 0 | | ABAP data type (C,D,N,...) | X | | Internal Length in Bytes | 000004 | | Reference Table for Field | | | Name of included table | | | Reference Field for Currency and Quantity Fields | | | Check or generating module for fields | | | Indicator for initial values in database fields | | | Data Type in ABAP Dictionary | INT4 | | Length (No. of Characters) | 000010 | | Number of Decimal Places | 000000 | | Domain name | | | Origin of an Input Help | | | DD: Flag if it is a table | | | DD: Depth for structured types | 01 | | DD: Component Type | | | Type of Object Referenced | | | DD: Indicator for a Language Field | | | Position of the field in the table | 0000 | | Anonymization Indicator (for User Fields) | | | DD: Output Style (Output Style) for Decfloat Types | 00 | | Spatial Reference System | 0 | | Short Description of Repository Objects | | See details of SAP CGPL_MSPREQUEST_RESPONSE table |
CGPL_MSP_TASK_HEADER_INT-EARNED_VALUE_METHOD - ▼
Description:
Field Name: EARNED_VALUE_METHOD
Data Element:
Data Type: INT4
Length (Dec): 000010 (000000)
Check Table:
Conversion Routine:
Domain Name:
Memory ID:
App Class:
SHLP Name:
SHLP Field:
| Table Name | CGPL_MSP_TASK_HEADER_INT | | Field Name | EARNED_VALUE_METHOD | | Activation State of Repository Object | A | | Version of the entry (not used) | 0000 | | Position of the field in the table | 0085 | | Identifies a key field of a table | | | Flag: Field is required (not blank) | | | Data element (semantic domain) | | | Check table name of the foreign key | | | Nesting depth for includes | 0 | | ABAP data type (C,D,N,...) | X | | Internal Length in Bytes | 000004 | | Reference Table for Field | | | Name of included table | | | Reference Field for Currency and Quantity Fields | | | Check or generating module for fields | | | Indicator for initial values in database fields | | | Data Type in ABAP Dictionary | INT4 | | Length (No. of Characters) | 000010 | | Number of Decimal Places | 000000 | | Domain name | | | Origin of an Input Help | | | DD: Flag if it is a table | | | DD: Depth for structured types | 00 | | DD: Component Type | | | Type of Object Referenced | | | DD: Indicator for a Language Field | | | Position of the field in the table | 0000 | | Anonymization Indicator (for User Fields) | | | DD: Output Style (Output Style) for Decfloat Types | 00 | | Spatial Reference System | 0 | | Short Description of Repository Objects | | See details of SAP CGPL_MSP_TASK_HEADER_INT table |
DPR_MSP_PROJECT_DATA_INT-EARNED_VALUE_METHOD - The default method for calculating earned value. ▼
Description: The default method for calculating earned value.
Field Name: EARNED_VALUE_METHOD
Data Element:
Data Type: INT4
Length (Dec): 000010 (000000)
Check Table:
Conversion Routine:
Domain Name:
Memory ID:
App Class:
SHLP Name:
SHLP Field:
| Table Name | DPR_MSP_PROJECT_DATA_INT | | Field Name | EARNED_VALUE_METHOD | | Activation State of Repository Object | A | | Version of the entry (not used) | 0000 | | Position of the field in the table | 0034 | | Identifies a key field of a table | | | Flag: Field is required (not blank) | | | Data element (semantic domain) | | | Check table name of the foreign key | | | Nesting depth for includes | 0 | | ABAP data type (C,D,N,...) | X | | Internal Length in Bytes | 000004 | | Reference Table for Field | | | Name of included table | | | Reference Field for Currency and Quantity Fields | | | Check or generating module for fields | | | Indicator for initial values in database fields | | | Data Type in ABAP Dictionary | INT4 | | Length (No. of Characters) | 000010 | | Number of Decimal Places | 000000 | | Domain name | | | Origin of an Input Help | | | DD: Flag if it is a table | | | DD: Depth for structured types | 00 | | DD: Component Type | | | Type of Object Referenced | | | DD: Indicator for a Language Field | | | Position of the field in the table | 0000 | | Anonymization Indicator (for User Fields) | | | DD: Output Style (Output Style) for Decfloat Types | 00 | | Spatial Reference System | 0 | | Short Description of Repository Objects | | See details of SAP DPR_MSP_PROJECT_DATA_INT table |
CGPL_MSP_PROJECT_DATA_INT-EARNED_VALUE_METHOD - ▼
Description:
Field Name: EARNED_VALUE_METHOD
Data Element:
Data Type: INT4
Length (Dec): 000010 (000000)
Check Table:
Conversion Routine:
Domain Name:
Memory ID:
App Class:
SHLP Name:
SHLP Field:
| Table Name | CGPL_MSP_PROJECT_DATA_INT | | Field Name | EARNED_VALUE_METHOD | | Activation State of Repository Object | A | | Version of the entry (not used) | 0000 | | Position of the field in the table | 0034 | | Identifies a key field of a table | | | Flag: Field is required (not blank) | | | Data element (semantic domain) | | | Check table name of the foreign key | | | Nesting depth for includes | 0 | | ABAP data type (C,D,N,...) | X | | Internal Length in Bytes | 000004 | | Reference Table for Field | | | Name of included table | | | Reference Field for Currency and Quantity Fields | | | Check or generating module for fields | | | Indicator for initial values in database fields | | | Data Type in ABAP Dictionary | INT4 | | Length (No. of Characters) | 000010 | | Number of Decimal Places | 000000 | | Domain name | | | Origin of an Input Help | | | DD: Flag if it is a table | | | DD: Depth for structured types | 00 | | DD: Component Type | | | Type of Object Referenced | | | DD: Indicator for a Language Field | | | Position of the field in the table | 0000 | | Anonymization Indicator (for User Fields) | | | DD: Output Style (Output Style) for Decfloat Types | 00 | | Spatial Reference System | 0 | | Short Description of Repository Objects | | See details of SAP CGPL_MSP_PROJECT_DATA_INT table |
DPR_MSPREQUEST_RESPONSE_TASK-EARNED_VALUE_METHOD - The method for calculating earned value. ▼
Description: The method for calculating earned value.
Field Name: EARNED_VALUE_METHOD
Data Element:
Data Type: INT4
Length (Dec): 000010 (000000)
Check Table:
Conversion Routine:
Domain Name:
Memory ID:
App Class:
SHLP Name:
SHLP Field:
| Table Name | DPR_MSPREQUEST_RESPONSE_TASK | | Field Name | EARNED_VALUE_METHOD | | Activation State of Repository Object | A | | Version of the entry (not used) | 0000 | | Position of the field in the table | 0084 | | Identifies a key field of a table | | | Flag: Field is required (not blank) | | | Data element (semantic domain) | | | Check table name of the foreign key | | | Nesting depth for includes | 0 | | ABAP data type (C,D,N,...) | X | | Internal Length in Bytes | 000004 | | Reference Table for Field | | | Name of included table | | | Reference Field for Currency and Quantity Fields | | | Check or generating module for fields | | | Indicator for initial values in database fields | | | Data Type in ABAP Dictionary | INT4 | | Length (No. of Characters) | 000010 | | Number of Decimal Places | 000000 | | Domain name | | | Origin of an Input Help | | | DD: Flag if it is a table | | | DD: Depth for structured types | 00 | | DD: Component Type | | | Type of Object Referenced | | | DD: Indicator for a Language Field | | | Position of the field in the table | 0000 | | Anonymization Indicator (for User Fields) | | | DD: Output Style (Output Style) for Decfloat Types | 00 | | Spatial Reference System | 0 | | Short Description of Repository Objects | | See details of SAP DPR_MSPREQUEST_RESPONSE_TASK table |
CGPL_MSPREQUEST_RESPONSE_PROJ-EARNED_VALUE_METHOD - ▼
Description:
Field Name: EARNED_VALUE_METHOD
Data Element:
Data Type: INT4
Length (Dec): 000010 (000000)
Check Table:
Conversion Routine:
Domain Name:
Memory ID:
App Class:
SHLP Name:
SHLP Field:
| Table Name | CGPL_MSPREQUEST_RESPONSE_PROJ | | Field Name | EARNED_VALUE_METHOD | | Activation State of Repository Object | A | | Version of the entry (not used) | 0000 | | Position of the field in the table | 0036 | | Identifies a key field of a table | | | Flag: Field is required (not blank) | | | Data element (semantic domain) | | | Check table name of the foreign key | | | Nesting depth for includes | 0 | | ABAP data type (C,D,N,...) | X | | Internal Length in Bytes | 000004 | | Reference Table for Field | | | Name of included table | | | Reference Field for Currency and Quantity Fields | | | Check or generating module for fields | | | Indicator for initial values in database fields | | | Data Type in ABAP Dictionary | INT4 | | Length (No. of Characters) | 000010 | | Number of Decimal Places | 000000 | | Domain name | | | Origin of an Input Help | | | DD: Flag if it is a table | | | DD: Depth for structured types | 00 | | DD: Component Type | | | Type of Object Referenced | | | DD: Indicator for a Language Field | | | Position of the field in the table | 0000 | | Anonymization Indicator (for User Fields) | | | DD: Output Style (Output Style) for Decfloat Types | 00 | | Spatial Reference System | 0 | | Short Description of Repository Objects | | See details of SAP CGPL_MSPREQUEST_RESPONSE_PROJ table |
CGPL_MSPREQUEST_RESPONSE_TASK-EARNED_VALUE_METHOD - ▼
Description:
Field Name: EARNED_VALUE_METHOD
Data Element:
Data Type: INT4
Length (Dec): 000010 (000000)
Check Table:
Conversion Routine:
Domain Name:
Memory ID:
App Class:
SHLP Name:
SHLP Field:
| Table Name | CGPL_MSPREQUEST_RESPONSE_TASK | | Field Name | EARNED_VALUE_METHOD | | Activation State of Repository Object | A | | Version of the entry (not used) | 0000 | | Position of the field in the table | 0084 | | Identifies a key field of a table | | | Flag: Field is required (not blank) | | | Data element (semantic domain) | | | Check table name of the foreign key | | | Nesting depth for includes | 0 | | ABAP data type (C,D,N,...) | X | | Internal Length in Bytes | 000004 | | Reference Table for Field | | | Name of included table | | | Reference Field for Currency and Quantity Fields | | | Check or generating module for fields | | | Indicator for initial values in database fields | | | Data Type in ABAP Dictionary | INT4 | | Length (No. of Characters) | 000010 | | Number of Decimal Places | 000000 | | Domain name | | | Origin of an Input Help | | | DD: Flag if it is a table | | | DD: Depth for structured types | 00 | | DD: Component Type | | | Type of Object Referenced | | | DD: Indicator for a Language Field | | | Position of the field in the table | 0000 | | Anonymization Indicator (for User Fields) | | | DD: Output Style (Output Style) for Decfloat Types | 00 | | Spatial Reference System | 0 | | Short Description of Repository Objects | | See details of SAP CGPL_MSPREQUEST_RESPONSE_TASK table |
DPR_MSPREQUEST_RESPONSE_PROJEC-EARNED_VALUE_METHOD - The default method for calculating earned value. ▼
Description: The default method for calculating earned value.
Field Name: EARNED_VALUE_METHOD
Data Element:
Data Type: INT4
Length (Dec): 000010 (000000)
Check Table:
Conversion Routine:
Domain Name:
Memory ID:
App Class:
SHLP Name:
SHLP Field:
| Table Name | DPR_MSPREQUEST_RESPONSE_PROJEC | | Field Name | EARNED_VALUE_METHOD | | Activation State of Repository Object | A | | Version of the entry (not used) | 0000 | | Position of the field in the table | 0036 | | Identifies a key field of a table | | | Flag: Field is required (not blank) | | | Data element (semantic domain) | | | Check table name of the foreign key | | | Nesting depth for includes | 0 | | ABAP data type (C,D,N,...) | X | | Internal Length in Bytes | 000004 | | Reference Table for Field | | | Name of included table | | | Reference Field for Currency and Quantity Fields | | | Check or generating module for fields | | | Indicator for initial values in database fields | | | Data Type in ABAP Dictionary | INT4 | | Length (No. of Characters) | 000010 | | Number of Decimal Places | 000000 | | Domain name | | | Origin of an Input Help | | | DD: Flag if it is a table | | | DD: Depth for structured types | 00 | | DD: Component Type | | | Type of Object Referenced | | | DD: Indicator for a Language Field | | | Position of the field in the table | 0000 | | Anonymization Indicator (for User Fields) | | | DD: Output Style (Output Style) for Decfloat Types | 00 | | Spatial Reference System | 0 | | Short Description of Repository Objects | | See details of SAP DPR_MSPREQUEST_RESPONSE_PROJEC table |